Wychwood Subdivision, City of Brampton Low Impact Development Infrastructure Performance and Risk Assessment

Posted by | 0 Comments

This ongoing 5 year study at the Wychwood Subdivision in Brampton is focused on quantifying the reduction in runoff volume and pollutant load from the site.  The site is the first low impact development (LID) residential subdivision in Brampton. All stormwater runoff is managed on-site through a variety of LID practices, including an infiltration trench, bioswale, rain gardens and permeable pavement driveways.

CVC will complete the multi-year monitoring study of the Wychwood Subdivision under the Infrastructure Performance Risk Assessment Program at the end of 2020. A final technical brief will be available upon the completion of the project.

Webpage       │       Interim Report       │       Project Fact Sheet

Address:

Walnut Road, Brampton