Central Parkway Low Impact Development Infrastructure Performance and Risk Assessment

Posted by | 0 Comments

This study initiated in 2015 evaluates a Low Impact Development (LID) road retrofit on Central Parkway East in Mississauga.  The site utilizes a DeepRoot Silva Cell bioretention system within the existing road median.  Runoff flows from the road towards the existing catch basins and into the tree-lined landscape feature.

The LID practices at Central Parkway treat stormwater runoff, promote infiltration, and slow the release of stormwater runoff.  The construction of the Central Parkway retrofit completed in Spring 2015.

Full Report       │       Case Study       │       Project Fact Sheet

Address:

1250 Central Pkwy E, Mississauga