Erosion and Sediment Control Plan Design in the New ESC Guide for Urban Construction

Posted by | 0 Comments
When:
September 23, 2020 @ 10:00 am – 12:00 pm America/Toronto Timezone
2020-09-23T10:00:00-04:00
2020-09-23T12:00:00-04:00
Where:
Online Webinar
Cost:
$99

Erosion and Sediment Control Plan Design in the New ESC Guide for Urban Construction: The How To’s of Assessing Erosion Risk, Designing Effective Plans, and Submitting a Complete Application

Overview

A 2.5 to 3 hour session geared towards agency reviewers, designers, and construction professionals to describe the practical application of the following 2019 Erosion and Sediment Control Guide For Urban Construction chapters.

Chapter 6: Erosion Risk Assessment

  • Overview of Erosion Risk Assessment (ERA) approach
  • Overview of RUSLE equation and Ministry of Transportation (MTO) qualitative methods
  • ERA approach flow chart
  • Example ERA

Chapter 7: E&SC Plan Design:

  • Best Management Practice (BMP) Selection
  • BMP Design
  • Standard notes
  • Construction Staging
  • Special Considerations (Species at Risk (SAR), Low Impact Development (LID), etc.)

Chapter 8: Plan Submission Requirements

  • Level of detail for various studies
  • Submission requirements

Learning Objectives

  1. Erosion Risk Assessment: Participants will gain an understanding of the ERA approach and will be able to carry out / follow along with a practical example.
  2. ESC Design: Participants will learn the elements of various BMP designs and overall considerations in establishing an ESC plan.
  3. Plan Submission: Participants will learn the expected level of detail for ESC at various levels of study (preliminary engineering, functional servicing, detailed design / site alteration, etc.) to facilitate the plan preparation and review process.

Instructors

 